Replacing a KNX Panel in an Existing Building: What to Check Before Ordering
Replacing a panel in a completed KNX building involves two separate questions: will the new unit fit the existing installation, and can the project integrator configure it to perform the required controls? A similar appearance or a matching screen size does not answer either question.
This checklist is for KNX system integrators, contractors and project buyers planning to replace an existing wall control or touch panel. Confirm the final device and work scope with the relevant manufacturer and integrator before ordering.
1. Identify what is installed
Record the current manufacturer, product name, exact model or article number, and the type of panel: push-button control, room controller or touch panel. Photograph the front and any visible identification label. Have a qualified installer document the installation and wiring; do not remove a powered device to look for a label.
Keep the original ETS project file, device application information, installation manual and any room-control schedule if they are available. If the existing model is discontinued, ask the original manufacturer whether product data or a replacement reference is still available.
2. Separate mechanical fit from KNX project fit
For the physical installation, confirm the existing opening or flush-mounted box, mounting method, usable depth, panel dimensions and whether the replacement is flush-mounted or surface-mounted. A supplier’s replacement list may be a useful starting point, but check that it names the same old model and installation variant as the project.
For the KNX project, ask the integrator to review the current device application, required functions and the relevant group objects. A device that fits the wall is not automatically a functional replacement, and a functional match is not automatically a mechanical fit.
3. Review the ETS migration before ordering
The KNX Association’s ETS Replace Device guidance describes replacing an unavailable device with one of similar functionality, including a device from another manufacturer. Its workflow maps relevant Group Objects between the original and replacement devices. The guidance also states that device parameter configuration is not included in that mapping, so the integrator must review and configure the replacement as needed.
Ask the integrator to check the proposed device’s ETS product data and identify what must be reconfigured or commissioned. Do not assume that all settings, room logic, labels or behavior will transfer automatically. The project file and exact replacement device should be reviewed together.
4. Confirm the exact replacement variant and documents
Ask the supplier to quote the exact order code and provide the current datasheet, installation instructions and applicable ETS product data for that model. Check that manufacturer, model code, interface and documents refer to the same variant. If multiple versions share a product family, record the chosen code explicitly.
Some manufacturers publish replacement tables keyed to an existing panel model or mounting box. For example, DIVUS provides model- and installation-specific retrofit listings, while PEAKnx offers a replacement finder for older KNX control panels. These are references for the products named by those manufacturers; they do not establish that another device will fit or work in the same installation.
5. Agree the work and handover in writing
Before purchase, agree who will verify the mounting situation, supply or confirm ETS product data, update the project, commission the replacement and test each required function with the client. Record open questions and acceptance checks. For a multi-room project, confirm how the team will identify each panel and document the result after replacement.
Retrofit pre-order checklist
- Existing device: Manufacturer, product name and exact model/article number.
- Installation: Opening/box, mounting type, available depth and documented wiring/interface.
- Required behavior: Functions, labels and room-control tasks that must remain available.
- Proposed replacement: Exact order code and matching current documents.
- ETS project: Product data review, Group Object mapping and parameters requiring setup.
- Responsibilities: Supplier, integrator and contractor tasks, commissioning and handover.
A replacement decision should be based on both the physical installation and the KNX project. Browse the BIGHOUSE KNX panel collection for current products, read the general panel specification checklist, or share the existing model and project brief with BIGHOUSE. Any fit or compatibility assessment must be confirmed for the exact device and installation.
Common questions
Can a replacement KNX panel use the existing wall box?
Sometimes a manufacturer provides a replacement option for a named device and box. Do not assume the opening can be reused: compare the exact old model, box, mounting method and replacement instructions before ordering.
Can I replace a KNX device with one from another manufacturer?
The KNX Association documents an ETS replacement workflow for devices with similar functionality across manufacturers. The project integrator still needs to review the mapping and configure device parameters; this does not guarantee mechanical fit or identical behavior.
Will ETS transfer all of the old panel’s settings?
Do not assume so. The KNX Replace Device guidance says parameter configuration is not included in the Group Object mapping. Ask the integrator to check which settings and functions need to be configured and tested again.
What should I send a supplier for an initial replacement review?
Provide the existing manufacturer and exact model, a clear front photo, available installation or mounting-box information, the intended functions and the project market. Have a qualified installer capture any wiring or installation details. The supplier and integrator can then identify what remains to be confirmed.